• RSR Commissioning Services Inc. is the province’s Independent Commissioning Agent for the Mechanical systems related to the Calgary Cancer Centre (CCC).  This Alberta Infrastructure project targeted at $1.2 billion construction cost is fully operational thanks to the successful design-build team headed by PCL.  RSR has been involved in this project since late 2016 following our selection during the initial design bridging exercise and RFP process that was led by the team from ARUP.
  • The CCC is has achieved LEED Gold as developed by US Green Building Council, Healthcare Version 4.  The project has achieved a number of LEED points related to Mechanical systems, design innovations and energy conservation initiatives. These include water and energy efficiency strategies, reduced cooling tower water use, enhanced refrigerant management, enhanced indoor air quality strategies, green education and improved operation and maintenance strategies.
  • RSR was to be an active member of the total commissioning team in our role in reviewing the mechanical plans and specifications as they are released in numerous phases.  Our team was involved throughout the completion of the design, the construction and well into the first year of operations.